Site icon African Eye Report

Asante Gold Starts Bibiani Sulphide Plant Operation

Asante Gold logo

Vancouver, British Columbia// – Asante Gold Corporation, an emerging mid-tier gold producer, has provided an update on progress made on its sulphide plant at the Bibiani Gold Mine in Ghana.

 

 Recent Highlights

 

 

 

 

 

With the finances now in hand, we expect to grow long-term gold production to 450,000 to 500,000 ounces of gold per year,” Dave Anthony, President and CEO said.

“With construction and commissioning of the Bibiani sulphide treatment plant complete, we are focused on the next phase, which moves the plant into operation, ramp-up, testing and optimization to achieve 92% recovery and enhance Bibiani’s growth profile.”

Sulphide Plant Update Construction on the Bibiani sulphide plant first began in Q4 2024. The objective of this facility is to liberate and recover the gold that occurs within sulphide mineralisation.

For the ore at Bibiani that is below 110 metre (“m”) depth, approximately 30% of the gold occurs within sulphide mineralization and measures 35 microns.

The process flowsheet for the sulphide plant includes flotation, regrind of flotation concentrate to 25 microns, use of Aachen reactor technology to provide elevated oxygen levels in the high intensity leach and carbon in pulp (“CIP”) for gold recovery.

The flotation tailings and sulphide treatment plant tailings return to the carbon in leach (“CIL”) plant for further treatment. This process is expected to increase gold recovery significantly, from 60% to 92%, keeping in line with the Bibiani technical report published in April 2024.

The sulphide treatment plant commenced 12 hour per day operations on September 27, 2025. The Company expects to move to a 24-hour per day operation on September 30, 2025.

Optimization will proceed during October and 92% recovery is expected to be reached in late October 2025. Key Supply Partners Process test work on the Bibiani sulphide plant was completed by ALS (Australia), with principal process equipment suppliers being FlSmidth (USA), MO (Europe) Group and Maelgywn (South Africa).

Project design was conducted by Mining Process Project Engineering (MiningPro – Ghana Limited) and project management by Jet-Rom Engineering (Ghana).

Earnings Webcast Replay

A replay of the webcast conference call for the quarter ended July 31, 2025 is now available on the Asante website at https://asantegold.com or can be accessed here: conference call replay.

Qualified Person Statement

The scientific and technical information contained in this news release has been reviewed and approved by David Anthony, P.Eng., Mining and Mineral Processing, President and CEO of Asante, who is a “qualified person” under NI 43-101.

African Eye Report

Exit mobile version